
Petrol Forklifter LGP Fork Lifts 3tons Forklift with Gas Cylinder
Product Model: AC20/30-02-00-HW Lift truck side shifter cylinder
Our products are broadly identified and trustworthy by people and may meet continually modifying financial and social requires of Torque Converter Housing, forklift pedals, Forklift Engine Cylinder Head Cover. Innovation, the pursuit of excellence, teamwork is our company's required style of work. With the aggravation of market competition, the surge of public customers and the demand diversification, our company pays more and more attention to improving our overall service level through the construction of marketing channels.
Product Title: Side Shifter Cylinder for Hangcha CPCD25 Forklift
Product Model: AC20/30-02-00 Forklift Side Shifter Cylinder


The Parameters of This Side Shifter Cylinder for Forklift 1-3 Ton.
Item | Description |
Product Name | Side Shifter Cylinder Hangcha CPCD25 |
P/N | AC20/30-02-00 |
Applied Model | Forklift 1-3 Ton, Lift Truck CPCD25 |
Net Weight (kg) | 5.7 |
Gross Weight (kg) | 6.5 |
Qty per Carton | 1 |
Carton Size (cm) | 70*15*15 |
Specification of Forklift Side Shifter Cylinder
Name | Unit | Parameter |
Cylinder diameter (piston diameter) | mm | 40~160 |
Rod diameter (piston rod diameter) | mm | 20~120 |
Stroke | mm | 50~2500 |
Pressure | MPa | 16~25 |
Operating temperature | ℃ | -40~120 |
Piston rod coating NSS neutral salt spray test time | H | ≥96 |
4 Steps Guide On Install A Forklift Side Shifter Cylinder
1. Adjust the position of the side shift cylinder
Adjust the side shift cylinder to the right position before installed. Note that the position of the forklift side shift cylinder should be consistent with the wheel spacing, which will help improve the stability of the forklift.
2. Remove the original side shifter cylinder.
Make sure that the oil in the line has been drained, and the forklift lifting parts are in a balanced state. Then disassemble the forklift side shift cylinder with a wrench. Noted that all four screws have been removed.
3. Install a new side shift cylinder
Put the new forklift side shift cylinder in the correct position and use a wrench to secure the screws of the cylinder. Pay attention to the direction and position of the side shifter cylinder during the installation.
4. Adjust the pressure of the cylinder
Don't forget to adjust the pressure of the cylinder. Keep the pressure in an appropriate range. The side shifter cylinder would abnormally work whether the pressure is higher or lower than needed. Therefore, it is necessary to evaluate the working environment of the forklift and determine the appropriate pressure range before making adjustments.
Mainly designing all kinds of Petrol Forklifter LGP Fork Lifts 3tons Forklift with Gas Cylinder of ordinary, middle and high grades. We will strengthen the full service of 'pre-sales, in-sales and after-sales' to guide consumers to purchase rationally. We are looking forwards to establishing long-term business relationships with worldwide customers.
You Might Also Like
Send Inquiry


















